We changed the current meters relatively quickly with zero complications on the same mornings that we set up during HF28. The current meters are held vertically in the water column by buoys that remain 5 meters below the surface. In order to swap out the current meter we had to device a pulley system with a sliding knot to take the tension out of the line before we could do the swap.

error: Content is protected !!